Installed either before or after concrete pour to create activation from duct. NOTE: Drill a 2 1/2” (64mm) hole in concrete and a 2 1/4” (57mm) hole in duct.
$33.83 Original price was: $33.83.$22.15Current price is: $22.15.
35 in stock
Installed either before or after concrete pour to create activation from duct. NOTE: Drill a 2 1/2” (64mm) hole in concrete and a 2 1/4” (57mm) hole in duct.
No products in the cart.
